Mining

LYNN Priming Systems are designed to meet the serve, demanding operating conditions typical for the mining industry.

LYNN experts are MSHA 5000-23 certified to assist with on-site evaluation, start-up and training services.

Raw water feed and recirculating water pumps that supply water needed for ore extraction are critical in the mining process. A reliable LYNN Automatic Vacuum Priming System ensures these pumps are ready to start immediately whenever they are needed.

FEATURED INSTALLATIONS

Location:Hillsboro Energy LLC, Hillsboro IL
Engineer:LYNN

Location: Sierrita Mine, Green Valley, AZ
Engineer: LYNN/Freeport McMoRan Copper & Gold Inc.

Location: Thickener Project, AZ
Engineer:Tetra Tech

Location:Goro-Nickle SAS Project, New Caledonia
Engineer:LYNN/Vale

 

 


Contact LYNN for your pump and siphon priming needs.


 
LYNN Reliable through design